Preparing the brochure…
Motor yacht Avalon cruising the Bahamas
Asset Card The Yachting Edition
Charter · Management · Hardware

Yacht Finance,
without the blindspots.

Charter APA, Management, and Live Telemetry.
All in one place.

Featuring M/Y Avalon yacht.assetcard.io
The bridge of M/Y Avalon, instruments lit
Asset Card In command
Real-time control

Navigate your finances with the same precision as your vessel.

From the bridge, your vessel runs on live data and your finances should too. Asset Card captures every dollar that keeps your yacht running.

Manage the operation. Own the truth. 02
The Asset Card model

Every asset gets its own account.

Whether you're running a charter or managing a fleet, each asset gets its own account, balance, and cards. Every dollar tracked and funds never commingled.

Issued to the asset
Physical Asset Card Virtual Asset Card
Virtual — a fresh card for every vendor, broker or charter.
Physical — in hand onboard, for the captain.
Its own account M/Y Avalon project account — live balance and budget
Set limits per card, in a tap
Per-card limit Fuel & dockage only Daily cap Freeze anytime

Separate accounts. Separate ledgers. One login.

Asset Card · Yachting 03
M/Y Avalon and her tenders anchored off a beach
Asset Card Contents
What we cover

Three pillars, one platform.

Three core parts of running a yacht, finally on one platform. Charter APA, management, and live telemetry. Nothing siloed, nothing missed.

01
Charter APA
A dedicated account for every charter. Funded, tracked, and settled before the next guests step aboard.
p. 05
02
Yacht Management
Funding requests, bill pay, and spend tracked against your budget in real time. Ensuring your yacht's valuation is accurate and defensible.
p. 07
03
Hardware
Telemetry that means something. Turn speed, fuel, and engine data into real costs. Does your captain know what 17 knots costs versus 14? Now they will.
p. 09
yacht.assetcard.io 04
Avalon at anchor flanked by tenders
Pillar One Asset Card · Yachting
01

Charter APA

A dedicated account per charter, settled before the next one begins.

05
Asset Card Charter APA
The charter lifecycle

Follow the money, from signature to settlement.

1
Contract signed, account opens
A dedicated APA account opens the moment the agreement is signed.
2
Initial funding
The broker funds by wire or ACH. No fees, no holds, multi-currency accepted.
3
Cards issued to crew, control from anywhere
Visa cards in seconds, with per-card spend limits and merchant locks.
4
Real-time spend tracking
Every swipe posts instantly. The captain sees the balance, the broker sees the burn.
5
Guest portal access
The guest reads their folio like a hotel bill and tops up in a tap.
6
Settlement and close
Settlement is automatic. Unused funds returned, the statement finalized.
Avalon Charter APA in the Asset Card app
Live · Avalon Charter APA
The final statement is ready the day the charter ends. 06
9:41
‹ Avalon Charter APA
Routing No.
021 000 021
Account No.
•••• 4827
Asset Card
VISA
•••• 982403/25
Trip spendLIVE
$286,400
64%
of $ 450,000 · APA · M/Y Avalon
Today
Riviera Fuel
Jessica Hale
$ 28,750
COMPLETED
Antibes Provisions
Sofia Marin
$ 4,820
COMPLETED
Monaco Port Authority
Daniel Reyes
$ 14,000
COMPLETED
M/Y Avalon aft-deck dining

Issue Visa cards to the captain and crew in seconds, with per-card limits and merchant locks. Every swipe posts instantly, so the captain sees the running balance and the broker sees the burn rate, with no paper reconciliation at the end of the trip.

$250K
FDIC insured, per account
Same-day
Wires and global payouts
$0
Fees on incoming transfers
Avalon side deck at dusk
Pillar Two Asset Card · Yachting
02

Yacht Management

Less admin. Greater accuracy. The platform that works alongside your team so owners have instant transparency.

07
Asset Card Yacht Management
Mobile & web access

The whole fleet, accessed from anywhere.

Set budgets, approve spend and pay vendors. Captains and crew act from the deck; owners and managers oversee from the desk. The same ledger, wherever you are.

Mobile iOS & Android, on deck
Web any browser, at the desk
Crew expenses
All crew spend tracked against the budget with predictive GL coding.
Bill pay
Pay bills via ACH and wire transfers, capturing full records with approval flows.
Budgets & planning
Annual and per-trip budgets tracked live, on your chart of accounts.
Funding requests
Captains request, managers approve, funds move with a full audit trail.
Asset Card Projects dashboard — the Summer Seas fleet on mobile
Projects · the whole fleet in one view
Real time
P&L vs budget
$38.4M
Live asset valuation
US-banked
USD-native accounts
yacht.assetcard.io 08
M/Y Avalon running gear
Live Data Hub · Telemetry Black Box™
03

The Hardware

Hardware that tells a story.

The Asset Card Black Box plugs into your yacht's live telemetry (engine, fuel, electrical, position) and turns every reading into a real cost on the same ledger that drives your valuation. No manual logs, no estimates.

M/Y Avalon · Delta Marine · 45.95m · Cayman STREAMING
318 L/h
Fuel burn
$604 /hr
12,480 h
Engine hours
$311 /hr wear
12.4 kn
Speed
$915 /hr all-in
1,240 nm
Live range
$74 /nm
$96,500 Deferred wear, accruing
34% of true cost, never invoiced
Asset Card · Yachting 09
M/Y Avalon with her tenders
Asset Card Across the fleet
Asset Card vs the rest

One platform for all your management needs.

Live
Operations and real-time cash control, not delayed monthly reporting
Built-in
Asset valuation dashboard, updated against the live ledger
USD
US-native, US-banked accounts, with no European FX bleed
24/7
US-based concierge, with the Arvis AI agent built in
yacht.assetcard.io 10
Asset Card Product overview
Two products, one platform

Everything to run the charter and the management.

Charter APA
From $299
per boat / month
Billed monthly · the per-boat rate steps down as the fleet grows.
A dedicated, fully funded account for every charter your fleet runs.
Three charter accounts per boat, each a real US account
Free card loads and domestic ACH, no 0.5% load fees
Real-time feed, receipt capture and spend controls
Guest and owner portal with live spend and reporting
Yacht Management
From $199
per yacht / month
Billed monthly · priced by vessel size.
Budgets, approvals and live reporting for the whole operation.
Upload your chart of accounts and cost codes, or use ours
Funding requests with approvals, budget vs. actual live
Scan any bill, approve an amount, pay from the right vessel
AI accountant with QuickBooks and Xero sync

Running a multi-vessel fleet? Reach out for custom program pricing built around your operation.

Both built on one secure US-banking foundation
FDIC insured accounts Powered by Stripe Highest-grade fraud detection US treasury account per asset Real-time owner reporting US-based 24/7 support
yacht.assetcard.io 11
Asset Card Cost analysis
Where the savings come from

What your current software is quietly costing you.

Four places the old way leaks money on every charter. Asset Card closes each one.

No 0.5% load fees
A busy APA loads ~$300k a trip, often twice a month in season. At 0.5% that is $1,500 a load. Asset Card: $0.
~$15k–$25k
per year
No FX bleed
Every USD wire on a EUR / GBP account loses a 0.3–1% spread. On a $300k wire that is $900–$3,000, every move.
~$5k–$10k
per year
No fund lock-ups
European banking holds large USD balances for days, six figures frozen exactly when a charter needs it.
Six figures
freed up
Fraud caught live
Month-end reporting hides fraud in the gap. Asset Card posts every transaction live, so nothing goes unnoticed.
Unquantifiable
Risk eliminated
Total annual savings
~$20k–$35k per yacht, per year
≈ $3.4M–$6.0Macross a 170-yacht fleet
The switch pays for itself before the product value is even counted.
yacht.assetcard.io 12
Asset Card Client outcomes
Real conversions from competing platforms

What operators say since switching.

Two operators, two different competitors. Both chose Asset Card, both onboarded within days.

Switched from Voly
Authentic Yacht Charters
US-based charter operator · 16 vessels
16
Vessels moved
across
<7 days
Cards in the
owner's hands

A named physical card for every captain and chef, per-card limits and merchant locks across the fleet, and every employee onboarded the same day.

Switched from Centtrip
Aquazeal & Bahamas Yacht Support
Two companies · four yachts · one owner
4
Yacht accounts
funded
$0
Funds ever
held or locked

Both companies running under a single login, each with dedicated accounts and spend cards, funded and live from the day they switched.

“I have never seen money loaded onto a platform so quickly.”

Owner · Aquazeal & Bahamas Yacht Support
yacht.assetcard.io 13
Asset Card Security
The foundation

Security isn't a feature. It's the foundation.

Every dollar on Asset Card is protected to bank standards, end to end.

The rails beneath every transaction
55,000
Transactions a minute

Stripe processes over $2 trillion in payment volume annually. Your money runs on the same proven, bank-grade rails built for global scale.

Held to bank standards, at every layer
Bank-grade rails
Built on Stripe and Celtic Bank, Member FDIC, the rails behind the world's largest platforms.
FDIC insured
$250,000 per depositor via Fifth Third Bank, Member FDIC.
End-to-end encryption
Data encrypted in transit and at rest. Card numbers tokenized, credentials never stored in readable form.
Full dispute handling
Fraudulent, duplicate or unrecognized charges. Open in-app, track every stage, no call center.
2FA & biometrics
Two-factor and Face ID on every login. Transfers and card reveals demand extra verification.
Role-based access
Owner, admin, manager, accountant, crew. Each role sees and approves only what you grant.
Powered by Stripe Issued by Celtic Bank, Member FDIC FDIC insured to $250K per depositor Real-time fraud detection
Asset Card · Yachting 14
Avalon at rest, calm water
Asset Card Yachting
Scan for yacht.assetcard.io
Scan to explore
yacht.assetcard.io

Manage the operation.
Own the truth.

Live operations, real-time cash control, and a valuation you can defend. Run charter, management, and hardware on one account.

Schedule a demo yacht.assetcard.io
Live financial infrastructure for the yachting industry. Built in West Palm Beach, Florida.  ·  +1 561 946 5063  ·  contact@assetcard.io
Asset Card Visa® Commercial cards are powered by Stripe and issued by Celtic Bank.
15
— / —
Swipe, drag a corner, or tap the buttons